Project: Brackley Leisure Centre

Location:
South Northamptonshire

A Tridium system complete with BEMS head end and graphics package was installed. The scheme comprises a mix of low temperature hot water plant, chillers, and ventilation air handing units.

  • Boiler plant
  • Pool temperature control
  • Pool ventilation
  • AHU system 6 number
  • Metering system

backback
Location:
South Northamptonshire